When will M2 reopen...
-
- Posts: 985
- Joined: Thu Feb 25, 2010 10:31 pm
- Location: Sydney
Re: When will M2 reopen...
Postby rogan » Fri May 29, 2015 7:33 am
- Boognoss
- Super Mod
- Posts: 6879
- Joined: Sat Nov 10, 2007 11:45 am
- Location: Castle Hill, NSW
- Contact:
Re: When will M2 reopen...
Postby Boognoss » Fri May 29, 2015 9:50 am
I've tried this path once heading up hill recently on an investigative mission. I don't recall anything like 10cm rises but it was much more narrow and rough then the western side. Passable (just) but if you have cyclists travelling each way and passing each other there are plenty of sections where it's too narrow.rogan wrote:Last time I tried the eastern/golf course side, it was rideable BUT at one point there was a huge rise between the pavers, at lest 10 cm. Rideable in a downhill direction, but not uphill. Take it easy along there, especially if it's dark.
- Boognoss
- Super Mod
- Posts: 6879
- Joined: Sat Nov 10, 2007 11:45 am
- Location: Castle Hill, NSW
- Contact:
Re: When will M2 reopen...
Postby Boognoss » Fri May 29, 2015 9:52 am
You know my level of experience with the area (same as yours) so yes of course the trucks are a definite factor that I had in mind when I posted .queequeg wrote:That's also an option. It's a fine line between being stuck between two cars and being stuck between two B-Doubles though. You are right though, claim the lane to Eaton Rd then the pathBoognoss wrote:I'm thinking of just taking the left lane up Pennant Hills Rd until I'm past that block, then back to the path up to Castle Hill Rd. the eastern path is pretty awful. One downside is that those cagers might hold me up .
-
- Posts: 27
- Joined: Mon Feb 02, 2015 7:57 pm
Re: When will M2 reopen...
Postby shouldnobetter » Fri May 29, 2015 5:51 pm
I ride up that eastern footpath on my way home when I've taken the M2, which I'm doing frequently now since it makes it such an easy commute for me, so I had a closer look tonight.rogan wrote:Last time I tried the eastern/golf course side, it was rideable BUT at one point there was a huge rise between the pavers, at lest 10 cm. Rideable in a downhill direction, but not uphill. Take it easy along there, especially if it's dark.
For much of it, the footpath is significantly above the height of the road. There is the roadway, a retaining wall, then the footpath with a solid fence on one side and the golf course fence on the other. I'd guess the distance between the two fences would be between 1.5 and 2.5 metres. So not a lot of room for bikes to pass each other.
I'm happy going up there the way it is now. There is indeed a 10cm, or more, step about 1/4 of the way up, which I almost stop for. Apart from that it is OK, just very narrow with bushes jutting out and one lamppost that leaves a gap only about 6 inches wider than my handlebars. I never meet anyone coming the other way, so passing isn't an issue the way it is. If more people were to start going up and down it, that would be another story.
Although I go that way in the mornings, I seldom go down the footpath, preferring to wait at Copeland Rd for the lights to stop most of the traffic coming down Pennant Hills Rd, then riding down the road.
- queequeg
- Posts: 6512
- Joined: Thu Dec 17, 2009 10:09 am
Re: When will M2 reopen...
Postby queequeg » Sat Jun 20, 2015 12:25 pm
I think I will give the road lane a go up to Eaton Rd.
-
- Posts: 985
- Joined: Thu Feb 25, 2010 10:31 pm
- Location: Sydney
Re: When will M2 reopen...
Postby rogan » Sat Jun 20, 2015 1:34 pm
- Boognoss
- Super Mod
- Posts: 6879
- Joined: Sat Nov 10, 2007 11:45 am
- Location: Castle Hill, NSW
- Contact:
Re: When will M2 reopen...
Postby Boognoss » Sat Jun 20, 2015 4:45 pm
Yep full lane, right hand wheel track for me to Eaton. Some of the houses have already been demolished with the path still open, only in the latter part of the week just gone.rogan wrote:At a guess, it'll be closed by first week of July. Proper construction starts on Monday - they are going to take full possession very soon for site establishment. I suppose they first demolish those 4 or 5 houses, and likely they don't want that footpath open whilst they do that.
- queequeg
- Posts: 6512
- Joined: Thu Dec 17, 2009 10:09 am
Re: When will M2 reopen...
Postby queequeg » Sat Jun 20, 2015 10:55 pm
I think the only left is the newish one right on the corner, but I am expecting that gone shortly too. I'll start doing the road lane this week I think.Boognoss wrote:Yep full lane, right hand wheel track for me to Eaton. Some of the houses have already been demolished with the path still open, only in the latter part of the week just gone.rogan wrote:At a guess, it'll be closed by first week of July. Proper construction starts on Monday - they are going to take full possession very soon for site establishment. I suppose they first demolish those 4 or 5 houses, and likely they don't want that footpath open whilst they do that.
-
- Posts: 27
- Joined: Mon Feb 02, 2015 7:57 pm
Re: When will M2 reopen...
Postby shouldnobetter » Tue Jun 23, 2015 5:47 pm
- queequeg
- Posts: 6512
- Joined: Thu Dec 17, 2009 10:09 am
Re: When will M2 reopen...
Postby queequeg » Tue Jun 23, 2015 11:49 pm
Really? Interesting. Have they cut back the trees further up as well?shouldnobetter wrote:Maybe the closing of the western footpath explains why the step near the bottom of the eastern footpath has been smoothed off a little with some bitumen today.
Boognoss & I took the road lane on Monday. No issues, except it was slower than the path. We took the road all the way to Oratava Rd before jumping back on the path, as the traffic was moving roughly our speed.
- Boognoss
- Super Mod
- Posts: 6879
- Joined: Sat Nov 10, 2007 11:45 am
- Location: Castle Hill, NSW
- Contact:
Re: When will M2 reopen...
Postby Boognoss » Wed Jun 24, 2015 5:45 am
- Xplora
- Posts: 8272
- Joined: Sat Dec 11, 2010 12:33 am
- Location: TL;DR
Re: When will M2 reopen...
Postby Xplora » Wed Jun 24, 2015 10:30 am
- Boognoss
- Super Mod
- Posts: 6879
- Joined: Sat Nov 10, 2007 11:45 am
- Location: Castle Hill, NSW
- Contact:
Re: When will M2 reopen...
Postby Boognoss » Wed Jun 24, 2015 10:37 am
- Xplora
- Posts: 8272
- Joined: Sat Dec 11, 2010 12:33 am
- Location: TL;DR
Re: When will M2 reopen...
Postby Xplora » Wed Jun 24, 2015 10:46 am
-
- Posts: 985
- Joined: Thu Feb 25, 2010 10:31 pm
- Location: Sydney
Re: When will M2 reopen...
Postby rogan » Wed Jun 24, 2015 10:48 am
Yeah, but... that section of road is nasty - it is uphill, peaking at 7% just before Copeland, and there is heaps of lane changing, as further up the hill it's a compulsory turnoff onto Castle Hill Rd. So you have people in that left lane who don't want to be there, and people in the other lanes trying to get into the left lane. Have a guess where it might look like there's a gap, if you're on a bike in heavy traffic... The Copeland Rd lights are also safety camera lights, so people are looking at their speedos rather than the traffic. Plus there are loads of trucks, it's the main and obvious route between western Sydney and the Central Coast/North Coast (which is why they are building the tunnel). It really is an ugly section of road for bikes. I have ridden it, but found the footpath much lower stress, so I haven't ridden the road by choice in years. There have been one or two occasions where someone parks on the footpath, but... Also, there are very few pedestrians.
At PM peak hour it is highly congested, but due to the traffic light phasing you can face the situation where after 2 minutes of standstill, the traffic is quickly doing 40 km/h up that hill. I can do that, but 600W efforts starting from stressful clip ins in heavy traffic are really not my preference.
If the golf course side footpath is rideable, I will use it. It is of course, illegal. I have said before, I will pay the fine if ever levied, and continue to ride the path. My alternative is turn left at the end of the M2 and then go Murray Farm Rd/Oakes Rd. In particular, Oakes Rd between Murray Farm Rd and Aiken Rd is not great at the PM peak, especially in dusk/dark.
- Boognoss
- Super Mod
- Posts: 6879
- Joined: Sat Nov 10, 2007 11:45 am
- Location: Castle Hill, NSW
- Contact:
Re: When will M2 reopen...
Postby Boognoss » Wed Jun 24, 2015 10:51 am
Edit: maybe not. Regardless that may become my default option if I decide the traffic is too hairy - I'm on the fence at the moment, trying it this week.
- queequeg
- Posts: 6512
- Joined: Thu Dec 17, 2009 10:09 am
Re: When will M2 reopen...
Postby queequeg » Wed Jun 24, 2015 12:58 pm
-
- Posts: 985
- Joined: Thu Feb 25, 2010 10:31 pm
- Location: Sydney
Re: When will M2 reopen...
Postby rogan » Wed Jun 24, 2015 1:12 pm
I'm not sure if there is shared path marking near the M2 on the north eastern side of that intersection.
- queequeg
- Posts: 6512
- Joined: Thu Dec 17, 2009 10:09 am
Re: When will M2 reopen...
Postby queequeg » Wed Jun 24, 2015 11:19 pm
From Copeland Rd I did the descent down to Cardinal Ave to punish myself on the Cardinal Killer, which a steep but quiet route. Yes, it is longer than directly up the path, but time is similar due to not having to wait for the second set of lights at Copeland Rd to get back on the Eastern Path.
The M2 has made me soft, so I am going to add Cardinal Ave into my afternoon commute, and I will add some variations to that by exiting at Beecroft Rd and doing either the old detour, the Kent Rd overpass to Boronia and Kirkham, or the loop back up through the rail tunnel and then down to the Sutherland Rd rollercoaster.
- Boognoss
- Super Mod
- Posts: 6879
- Joined: Sat Nov 10, 2007 11:45 am
- Location: Castle Hill, NSW
- Contact:
Re: When will M2 reopen...
Postby Boognoss » Thu Jun 25, 2015 4:43 am
As far as I know the western path has always been footpath only. The shared path sign did only appear when the M2 reopened post widening but with the eastbound section east of PHills Rd still being worked on at BWH. The path going north wasn't in the scope of works.rogan wrote:I thought the western path was plausibly, arguably a shared path, because of the shared path sign (picture of bike and picture of actual human being, printed in black or blue on white background) right down on the NW corner of the M2/Pennant Hills Rd intersection (it was part of the old detour). The intention was that cyclists cross Pennant Hills Rd, and follow the detour route up to Roselea, but the share path sign does not indicate that it doesn't also apply up the path.
I'm not sure if there is shared path marking near the M2 on the north eastern side of that intersection.
- queequeg
- Posts: 6512
- Joined: Thu Dec 17, 2009 10:09 am
Re: When will M2 reopen...
Postby queequeg » Thu Jun 25, 2015 7:15 am
- Boognoss
- Super Mod
- Posts: 6879
- Joined: Sat Nov 10, 2007 11:45 am
- Location: Castle Hill, NSW
- Contact:
Re: When will M2 reopen...
Postby Boognoss » Thu Jun 25, 2015 10:49 am
-
- Posts: 985
- Joined: Thu Feb 25, 2010 10:31 pm
- Location: Sydney
Re: When will M2 reopen...
Postby rogan » Thu Jun 25, 2015 11:07 am
Yep, me too, 7.30 pm. Maybe I'm the last to ride on it?Boognoss wrote:I got a last hurrah in on the way out yesterday. Western path, how we'll miss ye.....
- g-boaf
- Posts: 23344
- Joined: Mon Sep 26, 2011 6:11 pm
Re: When will M2 reopen...
Postby g-boaf » Thu Jun 25, 2015 11:20 am
I know. It's not nice having a steep hill and clipping in and having to get going. I can do it no problem, but having stressed out drivers in smokeboxes behind you doesn't help at all.Boognoss wrote:Wise words, but the darned hill and clipping in doesn't help the stress level - even if it's 90% in my head vs the actual situation.
They hate that you are there in the first place, let alone potentially holding them up for precious seconds.
- queequeg
- Posts: 6512
- Joined: Thu Dec 17, 2009 10:09 am
Re: When will M2 reopen...
Postby queequeg » Thu Jun 25, 2015 1:30 pm
It would be close. The worker was finishing the Eaton Rd end of the path at 6:15am this morning.rogan wrote:Yep, me too, 7.30 pm. Maybe I'm the last to ride on it?Boognoss wrote:I got a last hurrah in on the way out yesterday. Western path, how we'll miss ye.....
- General Australian Cycling Topics
- Info / announcements
- Buying a bike / parts
- General Cycling Discussion
- The Bike Shed
- Cycling Health
- Cycling Safety and Advocacy
- Women's Cycling
- Bike & Gear Reviews
- Cycling Trade
- Stolen Bikes
- Bicycle FAQs
- The Market Place
- Member to Member Bike and Gear Sales
- Want to Buy, Group Buy, Swap
- My Bikes or Gear Elsewhere
- Serious Biking
- Audax / Randonneuring
- Retro biking
- Commuting
- MTB
- Recumbents
- Fixed Gear/ Single Speed
- Track
- Electric Bicycles
- Cyclocross and Gravel Grinding
- Dragsters / Lowriders / Cruisers
- Children's Bikes
- Cargo Bikes and Utility Cycling
- Road Racing
- Road Biking
- Training
- Triathlon
- International and National Tours and Events
- Cycle Touring
- Touring Australia
- Touring Overseas
- Touring Bikes and Equipment
- Australia
- Western Australia
- New South Wales
- Queensland
- South Australia
- Victoria
- ACT
- Tasmania
- Northern Territory
Who is online
Users browsing this forum: No registered users
- All times are UTC+11:00
- Top
- Delete cookies
About the Australian Cycling Forums
The Australian Cycling Forums is a welcoming community where you can ask questions and talk about the type of bikes and cycling topics you like.
Bicycles Network Australia
Forum Information
Connect with BNA
This website uses affiliate links to retail platforms including ebay, amazon, proviz and ribble.